Something about DataStage, DataStage Administration, Job Designing,Developing, DataStage troubleshooting, DataStage Installation & Configuration, ETL, DataWareHousing, DB2, Teradata, Oracle and Scripting.
Showing posts with label fasttrack. Show all posts
Showing posts with label fasttrack. Show all posts
Tuesday, June 17, 2014
FastTrack Makes Your DataStage Development Faster
IBM introduced a tool called FastTrack that is a source to target mapping tool that is plugged straight into the Information Server and runs inside a browser.
The tool was introduced with the Information Server and is available in the 8.1 version.
As the name suggests IBM are using it to help in the analysis and design stage of a data integration project to do the source to target mapping and the definition of the transform rules. Since it is an Information Server product it runs against the Metadata Server and can share metadata with the other products and it can run inside a browser.
I have talked about it previously in New Product: IBM FastTrack for Source To Target Mapping and FastTrack Excel out of your DataStage project but now I have had the chance to see it in action on a Data Warehouse project. We have been using the tool for a few weeks now and we are impressed. It’s been easier to learn than other Information Server products and it manages to fit most of what you need inside frames on a single browse screen. Very few bugs and it has been in the hands of someone who doesn’t know a lot about DataStage and they have been able to complete mappings and generate DataStage jobs.
I hope to get some screenshots up in the weeks to come but here are some observations in how we have saved time with FastTrack:
Subscribe to:
Posts
(
Atom
)